Construction of 241 St. Botolph Ramp Begins this Week

April 13, 2015

Dear NEC Faculty, Staff, and Students,

Just a reminder and a few new details:

As you recall, work begins this Friday, April 17th, on construction of a new handicapped ramp at the entrance to the 241 St. Botolph Building.

Here’s what you need to know:

  • The main entrance to 241 will be shut down as of midnight, Thursday, 4/16.
  • The temporary entrance will be through the parking lot door.  The door will be unlocked and un-alarmed from 7am to 11pm.
  • A security guard will be stationed inside the door and there will be card readers available…all students, faculty and staff will be required to swipe I.D.s at the inside location.
  • A temporary walkway will marked through the lot.  Pedestrians, please use the designated walkway for your safety.
  • Parkers in the 241 parking lot: please use caution in driving through the lot, and in particular pulling into and backing out of parking spaces.

As always, if you have questions, contact Mike Ryan (617-585-1187), Karen Kidd   (617-585-1181) or Ellen Pfeifer (617-585-1143).

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.